logo site logo
  • Home
  • OUR PROJECTS
  • Gangway systems
    • ACCESSIBLE SYSTEMS
    • LIGHT WEIGHT SYTEMS
    • OFFSHORE SHIP TO SHORE GANGWAYS
    • MOTION COMPENSATED GANGWAY
  • NEWS
  • CONTACT US

Follow Us

close

OUR PROJECTS

  • Home
  • OUR PROJECTS

Pioneering gangway operation for offshore wind

8m mobilised to an offshore wind location, off Germany, on-board VOS Satisfaction.

Further Offshore wind developments

12m for offshore wind; operating for HvS DS (Holland); deployed on extended arm on MV Zwerver II (multi-cat)

Alternative to basket lift or swing rope

2 x 12ms delivered to Candy Fleet for Gulf of Mexico Operations, 2018. Operating from Candy Fleet Crew Boats.

Widening the scope of FCBs

3 x 12ms built and delivered to Penguin Shipyards for operations on their Flex 42 range of FCBs in Malaysia

Cost-effective solutions for EPCI Projects

12m deployed for Technip on MMA Offshore AHTS in 2018 off NW Australia for Shell Prelude

Safe operations alongside semi-sub

15m operating in Caspian Sea for LukOil

Long-term, safe operations in Gulf

15m operating for Saipem in Qatar on AMG’s “AOS Neptune”

15m operating on AMG’s “Vega Egypt” in UAE

Ship-to-ship (North Sea)

15m on MV Glomar Vantage connecting to DEME “Peter the Great”

Meeting challenging conditions in Venezuela

15m on-board Allianz MV Hermes (Damen Sea Axe design FCB); day and night time operations

Fit-for-purpose solution for EPCs/Projects

15m operating for TechnipFMC for Gorgon Stage 2 in NW Australia; on custom-made pedestal on MMA AHTS, “MMA Majestic”.

site logo
site logo

Quick Links

  • Undertun Norway
  • Our projects
  • News
  • Contact Us

NORWAY

+47 70 244848

post@undertun.no

+47 90 591948

sverre@undertun.no

Follow Us

Website by Pentagon Information Technology

Copyright © Undertun 2025